Saturday, October 12, 2019

2019 Major Projects

 Three major projects were completed Summer 2019!

After decades of band-aid repairs, 2nd front bathroom shower was gutted to the studs and redone. New shower is also larger than previous one as there were 2 layers of walls.

The back door finally yielded, after many years of service. An off-the-shelf size did not work, so Ed built a new one from FULL 2" thick pine. Hoboken Lock installed a pin-pad entry lock which is working so well, we plan to add it to the front door also.

The exhaust fan in the kitchen was sub-standard at best, so a new kitchen hood with exterior mounted fan was installed. Replacing the 15 year old range is next on the list!